Challenges

The Dallas City Performance Hall used the Longest Kalzip® Panels in North America. Because of this, the length of the panels presented logistical and hoisting challenges. Some of the lengths were 75 feet, 90 feet, and 146 feet, but the longest and hardest to handle were the 306 foot panels. For the first three lengths, a custom-built hoist was used to raise the panels to the roof surface without any damage to the light-gauge metal. However, the longest panels had to be manually lifted by twenty men on the roof and twenty men on the ground. Coordination was key, and thus, the men on the roof had to lift at the same time to avoid damaging the sensitive panels.

Also, the metal panel field fabrication required a significant amount of space. For the longest panels, which measured 306 feet, an adjacent busy road had to be shut down to allow for the necessary space for the panels’ fabrication. After that, the twenty member team on the ground was evenly positioned to safely move the panels next to the building, and the twenty member team positioned on the roof hoisted the metal panels.

Finally, many of the roof assembly components came from Europe, thereby necessitating careful ordering and tracking of these components. This was critical because shipping costs were high and lead times were extensive.

The Dallas City Performance Hall is a very unique building which will provide the City of Dallas a beautiful venue to explore the Arts. One of the unique characteristics of this building was its roofing component.

Due to the nature of the building, acoustics were major challenge in the design of the roof. The roof consisted of many layers of acoustic material capped off with Kalzip panels that exceeded single lengths at minimum of 125 feet and some up to 320 feet. Castro’s field operations exceeded the owners and
McCarthy’s expectations.

After various coordination meetings, the field supervision from Castro implemented this difficult roof with high quality performance and attention to detail. I recommend Castro Roofing for the 2012 Golden Hammer Award.”

Wesley J. Moncrief, Project Manager McCarthy Building Companies, Inc.

Client

City of Dallas

What we did

Installed the longest single standing seam metal roof panels in North America. Wow!

Contract

$1,327,050.00

NRCA Gold Circle Award

Asset 6

1st Place Winners: Outstanding Workmanship and the special Safety Innovation award

NTRCA Gold Hammer Award

Asset 21

1st Place Winner: Outstanding Commercial Roofing Project

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt